This job was to put a new drainage system into a new rugby pitch at Stirling.
The specifications for the work included 10mm gravel on the drainage pipe, a layer of grit on top of that and the last 6 inches to the surface was sand.
We lifted all surplus spoil from the drains and carted it to an on-site tipping area.
The pitch was then sand slitted and re-seeded by local firm, Greentech.
